失眠是什么原因引起的,chinese农村人妻tubesex,亚洲免费每日在线观看 ,男女18禁啪啪无遮挡激烈

News
你的位置:HomePage > News

Explaining the process flow of texture wall film, texture wall originally is such a thing--- Yongchun Texture Wall Membrane

* : * : admin * : 2023-04-03 10:17:42 * : 22
Explaining the process flow of texture wall film, texture wall originally is such a thing--- Yongchun Texture Wall Membrane

What is a texture wall membrane?

The decorative effect of the texture wall film is similar to that of wallpaper, with characteristics such as water and mold resistance, good adhesion, abrasion resistance, and strong decorative properties. It is a new type of wall decoration product that integrates high-tech and elegant art. Its advent is bound to become a new trend in wall decoration art. Suitable for wall decoration in residential, office buildings, hotels, entertainment venues, schools, kindergartens, hospital wards, and other places with high environmental requirements--- Yongchun Texture Wall Membrane

1、 Construction preparation

1. Painting tools: manual carving texture roller, tray, wool roller, wool brush, texture vertical roller, screen printing, plastic scraper, embossing roller, etc

Construction materials: special primer for texture wall film, special topcoat for texture wall film, main paste for texture wall film, wallpaper printing paint

3. Performance characteristics: free of formaldehyde, moisture-proof and mildew-proof, resistant to scrubbing up to 20000 times or more

Standard color: white material, requiring independent color mixing

Package specification: 5kg/18kg special primer for texture wall film, 5kg/18kg special topcoat for texture wall film, 20kg main paste for texture wall film--- Yongchun Texture Wall Membrane

6. After sales standard: It is guaranteed that it will not fade within 20 years.

2、 Construction process flow

1. Base treatment

First, deal with water seepage and leakage on the wall. The wall pit should be filled and leveled with water resistant putty with good adhesion. Large wall pits can be directly filled with cement mortar, and then leveled with putty as a whole. Note: Vertically aligning the internal and external corners of the wall will greatly improve the overall process quality. It is also recommended that appropriate white cement or gypsum powder be added to the putty at the external corners to increase their strength and prevent damage to the wall corners.

2. Construction steps

1) The foundation surface shall be roller coated with a layer of penetrating primer (DX-608), which shall be uniform and full.

2) Apply texture paint (DX-8900) of the same color to the roller and cover it.

3) Dip the main material of the texture wall film (DX-8900) with a feeding wool roller and apply the roller onto the wall--- Yongchun Texture Wall Membrane

4) Collect the material with a wool brush.

5) Use a vertical stripe roller to roll out the stripe shape.

6) Use a texture roller to roll out the desired pattern.

7) After drying, apply the finishing coat (DX-890A) to the roller.
主站蜘蛛池模板: 高密市| 灵璧县| 黄冈市| 绩溪县| 彭州市| 沁源县| 商洛市| 普兰店市| 梧州市| 泾阳县| 武威市| 分宜县| 临朐县| 台安县| 张掖市| 九龙坡区| 青川县| 芒康县| 金川县| 易门县| 蓬安县| 大丰市| 和顺县| 安国市| 花莲市| 称多县| 石棉县| 秭归县| 太湖县| 壶关县| 咸宁市| 河西区| 福贡县| 济源市| 宜春市| 中超| 浪卡子县| 井研县| 宜兰县| 巴塘县| 滦平县|